Last edited by Zukinos
Sunday, November 29, 2020 | History

3 edition of Assessing integrated resource plans prepared by electric utilities found in the catalog.

Assessing integrated resource plans prepared by electric utilities

Assessing integrated resource plans prepared by electric utilities

  • 371 Want to read
  • 10 Currently reading

Published by Oak Ridge National Laboratory, Available from the National Technical Information Service in Oak Ridge, Tenn, Springfield, VA .
Written in English

    Subjects:
  • Electric utilities -- Planning -- Evaluation,
  • Electric utilities -- United States -- Planning,
  • Resource allocation -- Evaluation,
  • Buildings -- Energy conservation

  • Edition Notes

    Other titlesEnergy Division.
    StatementEric Hirst ... [et al.].
    SeriesOak Ridge National Laboratory -- 198., ORNL (Series) -- 298.
    ContributionsHirst, Eric., Oak Ridge National Laboratory. Energy Division., United States. Dept. of Energy. Office of Buildings and Community Systems.
    The Physical Object
    Paginationvi, 41 p. :
    Number of Pages41
    ID Numbers
    Open LibraryOL17631744M
    OCLC/WorldCa21550480

    Subd. 2b. Optional integrated resource plan compliance for certain cooperatives. For the purposes of this subdivision, a "cooperative" means a generating and transmission cooperative electric association that has at least 80 percent of its member distribution cooperatives located outside of Minnesota and that provides less than four percent of the electricity annually sold at retail in the. Utilities in 33 states are currently required to file and gain regulatory approval for their integrated resource plans. IRPs are created to determine the least-cost combination of resources that. Per PSE's Electric Tariff G, Sched we also strongly encourage installers and our customers to report their battery installations throughout our service area by filling out and submitting this online notification form. By sharing your information, you’ll help PSE properly manage the services that we provide to all customers on our grid. You must currently be or plan to become a PSE business electric and/or natural gas customer. Your new property must be a multifamily or mixed-use dwelling with at least four attached units. Your new property must be within PSE's electric and/or natural gas service area(s).


Share this book
You might also like
555 Ways to Reward Your Dental Team

555 Ways to Reward Your Dental Team

Vernon, an anecdotal novel

Vernon, an anecdotal novel

The Open Secret

The Open Secret

Unconventional protein sources

Unconventional protein sources

Records of wells, water levels and chemical quality of water in Baker Valley, Baker County, Oregon

Records of wells, water levels and chemical quality of water in Baker Valley, Baker County, Oregon

The Star-chamber

The Star-chamber

Data collection strategies and methods for monitoring student flows

Data collection strategies and methods for monitoring student flows

Switzerland

Switzerland

Issues

Issues

East London women and their changing communities

East London women and their changing communities

Transportation systems reliability and safety

Transportation systems reliability and safety

Thats Doctor Sinatra you little bimbo

Thats Doctor Sinatra you little bimbo

Autoantibodies

Autoantibodies

CALS publications

CALS publications

Cleopatra

Cleopatra

Assessing integrated resource plans prepared by electric utilities Download PDF EPUB FB2

During the past several years, more and more electric utilities have prepared long-term resource plans that integrate demand-side programs into the utility's mix of energy and capacity resources. Several organizations have enumerated the states with laws or regulations requiring utilities to prepare such plans.

ASSESSING INTEGRATED RESOURCE PLANS PREPARED BY ELECTRIC UTILITIES ERIC HIRST, MARTIN SCHWEITZER, EVELIN YOURSTONE,* AND JOSEPH ETO* FEBRUARY Sponsored by Office of Buildings and Community Systems U.S.

Department of Energy 'Consultant, Albuquerque, New Mexico. "Lawrence Berkeley Laboratory, Berkeley, California OAK RIDGE NATIONAL LABORATORY.

@article{osti_, title = {Assessing integrated resource plans prepared by electric utilities}, author = {Hirst, E. and Schweitzer, M. and Yourstone, E.

and Eto, J.}, abstractNote = {This report discusses guidelines for long-term resource plans, based on the written reports only. The word plan refers to both the program worked out beforehand to accomplish a goal and the report that. n integrated resource plan is a utility plan for meeting forecasted annual peak and energy demand, plus some established reserve margin, through a combination of supply-side and demand-side resources over a specified future period.

For utilities, integrated resource planning is often quite time- and resource-intensive. Final version received March Integrated resource planning is a new way for electric utihties and state regulatory commrssions to cost-effectively meet future energy-service needs.

standards-based and interoperable utility network.” INTEGRATED DISTRIBUTION PLANNING Integrated distribution system planning in the 21st Century needs to assess physical a nd operational changes to the electric grid necessary to enable safe, reliable and affordable service that satisfies customers’ changing expectations and use of DERs.

Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems Trieu Mai, Easan Drury, Kelly Eurek, Natalie Bodington, Anthony Lopez, and Andrew Perry. Prepared under Task No.

DRS Technical Report NREL/TP-6A January   What is an integrated resource plan. An integrated resource plan is a roadmap that large utilities use to plan out generational acquisitions over five, 10, or 20 years (or more).

Many utilities use integrated resource plans for coal, natural gas, and. In order for utilities to plan for meeting future energy demand in the most cost-effective way, many states require utilities to file integrated resource plans (IRPs) with their state public utility commissions (PUCs).

IRPs first started in the s in response to the desire to better integrate energy efficiency into utility planning, the. The Integrated Resource Plan (IRP) helps inform those goals, and outlines what resources the utility needs to meet forecasted energy demands in the most efficient, cost-effective way possible.

and financial plan ning departments All resources owned by utility Resources selected primarily to mini mize electricity prices and maintain system reliability Integrated resource planning Diversity of resources, including utility-ownedplants, purchasesfromotherorga nizations, conservation and load-management programmes, transmission.

of integrated resource plans published by electric utilities operating in the Western United States. We analyze energy and peak demand forecasts from utility IRP plans filed in the early- and mid- s and compare these forecasts to subsequent actual observed loads. Public Utilities Fortnightly, VolNo 6, 15 Septemberpp ; E.

Hirst el at, Assessing Integrated Resource Plans Prepared by Electric Utilities, ORNL/ CON, Oak Ridge National Laboratory, Oak Ridge, TN, USA, ; National Association of Regulatory Utility Commis- sioners, Least-Cost Utility Planning, A Handbook for Public.

Future Electric Utility Regulation Advisory Group Meeting. Ma – 6 formal integrated resource plans (IRPs) – 3 long-term resource plans – 1 default service plan – Other state agency, RTO/ISO planning integrated DER assessment, address different kinds.

Abstract - Integrated resource planning (IRP) is a new way for utilities and state regulatory commissions to consistently assess a variety of demand and supply resources to cost-effectively meet customer energy-service needs. A good integrated resource plan: Guidelines for electric utilities and regulators [Hirst, Eric] on *FREE* shipping on qualifying offers.

A good integrated resource plan: Guidelines for electric utilities and regulatorsAuthor: Eric Hirst. @article{osti_, title = {A good integrated resource plan: Guidelines for electric utilities and regulators}, author = {Hirst, E}, abstractNote = {Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively.

Integrated Resource Plan i EXECUTIVE SUMMARY OG&E submits this Integrated Resource Plan (IRP) in compliance with requirements established pursuant to the Oklahoma Corporation Commission’s (OCC) Electric Utility Rules OAC and the Arkansas Public Service Commission’s (APSC) Resource Planning Guidelines for Electric Utilities.

Integrated Resource Plan. This is the first resource plan developed since PGE committed to cut our greenhouse gas emissions by more than 80% by We believe our IRP represents the very best path forward. The plan includes measured steps we can take today to address climate change.

Integrated Resource Planning Models. Need Stronger Resiliency Analysis WHITEPAPER Introduction. As reports of unusual cold fronts, wildfires, and floods continue to make news around the country, local and regional electric utilities are again compelled to consider the resilience of electric power grids in the.

face of weather-related disruptions. Integrated Resource Plan and Long Term Procurement Plan (IRP-LTPP) Background This is an “umbrella” planning proceeding to consider all of the Commission’s electric procurement policies and programs and ensure California has a safe, reliable, and cost-effective electricity supply.

INTRODUCTION Several new planning paradigms for electric utilities have emerged during the past few years, beginning with least-cost utility planning (Arizona Corporation Com- mission, ), then integrated resource planning (Hirst, ), and most recently integrated value-based plan- ning (Chamberlin et al., ).

Integrated Resource Plan. Actas amended, known as the Puerto Rico Energy Transformation and RELIEF Act, requires the Energy Bureau of the Public Service Regulatory Board the adoption of the necessary rules for the elaboration, presentation, evaluation, and approval of the Puerto Rico Electric Power Authority’s (PREPA’s) Integrated Resource Plan (IRP).

Integrated resource planning is built on principles of comprehensive and holistic analysis. Traditional methods of electric resource planning focussed on fisupply-sidefl projects only, i.e., construction of generation, transmission, and distribution facilities. Demand-side options, which. integrated utilities and restructured utilities.

Vertically integrated utilities are required to submit electric supply resource plans every two years with the aim of providing a balanced, environmentally responsible electricity portfolio. Meanwhile, restructured utilities must file updates to their portfolio action plans every three years.

Most states require their utilities to file Integrated Resource Plans (IRPs) forecasting their generation expansion over the next five to 20 years. The IRP process encourages utilities to model least-cost options for supplying energy, while also accounting for energy efficiencies, policy objectives, and desires of the public in a transparent.

Integrated resource planning (IRP) is a utility process that includes a cost-effective combination This document represents the review of the TenYear Site Plans for Florida’s - electric utilities, filed by 11 reporting utilities. 1: All findings of the Commission. This week, the Virginia State Corporation Commission rejected the Integrated Resource Plan (IRP) document for the state’s major utility, Dominion Energy.

IRPs guide investment and procurement decisions to find the least-cost outcome for regulated utilities and are used in over half of US states. To identify the most cost-effective resource portfolio, utilities shall evaluate all feasible supply and demand-side resource options on a consistent and comparable basis, and take into consideration risk and uncertainty (including but not limited to financial, competitive, reliability, operational, fuel supply, price volatility and anticipated environmental regulation).

Large, privately-owned regulated utilities tend to be more prepared to combat cyber threats than smaller energy companies, according to a new.

Black and Veatch (B&V) prepared this Bulk Energy Storage Study for PacifiCorp’s Integrated Resource Plan. The study is an update to work HDR Navigant performed to support the Integrated Resource Plan, incorporating updated information on three pumped hydro energy storage projects and a compressed air energy storage project within.

Electric Service Handbook for Permanent and Temporary Service on Single Family residential projects: 1/9/ Customer generation requirements: 12/01/ Meter socket catalog numbers: Underground Site Checklist: 5/31/ Tips on how to prepare your job site for underground electric service: Overhead Site Checklist: 5/31/ Indiana’s electric utilities are required to supply power at the lowest reasonable cost while providing safe and reliable service.

An Integrated Resource Plan (“IRP”) is a plan submitted by an electric utility to the Commission,1 and it assists the utility in making sure it has the necessary resources to fulfill this obligation to serve. Draft Green Book – May iii In the late s, California deregulated the electric industry, allowing customers to choose their power supplier.

But in andthe new electric system collapsed, saddling customers with high costs and rolling outages. (3)(a) An electric utility shall consider the social cost of greenhouse gas emissions, as determined by the commission for investor-owned utilities pursuant to RCW and the department for consumer-owned utilities, when developing integrated resource plans and clean energy action plans.

An electric utility must incorporate the social. Resource Adequacy of high-renewable electricity systems under a wide variety of weather conditions, renewable generation, and forced outages of electric generating resources.

Specifically, this study examines four key questions: How to maintain Resource Adequacy in the timeframe under growing loads and. Better integrate distribution and transmission plans as part of utility integrated resource plans to ensure truly integrated electricity system planning.

This should include examining options to strengthen Michigan's electrical connections between its peninsulas and with neighboring states. Integrated Resource/Procurement Planning Integrated resource plans (IRPs) are utility plans for meeting forecasted annual peak and energy demand through a portfolio of supply-side and demand-side resources over a specified future period.

As of earlyintegrated resource. Berkeley Lab has been a leader in critically evaluating and informing utility resource planning practices since the emergence of integrated resource planning in the s. It continues to conduct analyses across a wide range of electric system planning issues related to distributed energy resources, transmission expansion, renewables.

On JGreat River Energy (GRE or the Cooperative) filed its integrated resource plan. On Augthe Department of Commerce (the Department) submitted a letter indicating that it found GREs filing to be complete. On November 8,the Department submitted comments on the proposed resource plan.

Utility Integrated Resource Plan (IRP) Database. The AWEA Utility Integrated Resource Plan (IRP) Database provides details on electric utility IRPs filed in the United States since the beginning of It focuses on planned capacity additions, planned coal retirements, cost .(2) An integrated resource plan may include distribution resource plans or integrated system operation plans.

(C)(1) The commission shall have a proceeding to review each electrical utility's integrated resource plan. As part of the integrated resource plan filing, the commission shall allow intervention by interested parties. Also in April, the Minnesota Public Utilities Commission staff issued a report that proposed draft integrated distribution plan processes for the state's utilities.